Terms and Conditions
- Installation space preferably roof top where sunlight can directly reach the solar panels needs to be arranged by the customer.
- Any required permissions to access roof top or installation area to be arranged and provided by the customer.
- Installation process and activation may take anywhere from 15 to 30 days based on necessary approvals from respective authorities.